Owner: NYCEDC
Client: OHL, USA
Location: Staten Island and Brooklyn, New York
Construction Cost: $ 250 Million
The project involved the abandonment of two existing water siphons (36-inch and 42-inch) and the replacement with a new 72-inch water siphon across the New York Harbor and the Anchorage Channel, between Brooklyn and Staten Island.
Service Provided:
- Responsible for Geotechnical/Structural Instrumentation and Monitoring
- Installation and monitoring of the following instrumentation:
- 10 Inclinometers
- 18 Open-ended Piezometers
- 4 Multiple Point Borehole Extensometer
- 2-Automated Total Station
- 110 Surface Settlement Points
- Vibration Monitoring
- Noise Monitoring
- Shop drawing preparation for excavation support system and foundation for crane
- Geotechnical Borings for 120 foot deep TBM launching and receiving pits design